Venchiaredo Cheese Dairy

Design and upgrading of a wastewater treatment plant

360° Service

  • Design
  • Construction

Place

  • Sesto al Reghena (TV)

Purification Technologies

Construction year

  • 2004

Plant performance

    • Population Equivalent: 16000
    • Daily Output: 800 M3/Dd
    • COD In: <2000 Mg/L
    • COD Out: <100 Mg/L
    • Receiver: Surface Water Body

Need

The existing activated-sludge treatment plant was undersized and did not comply with the standards required by law as for discharge to land.

Solution

Because of the need of incrementing the system capability maintaining the existing tanks, in compliance with the strict limits set by law, we deemed necessary to upgrade the plant with the MBR technology.