Bernardi Invest S.r.l.

Design and construction of a wastewater treatment plant for Alpe Adria Shopping Centre

360° Service

Place

  • Cassacco (Ud) - Italy

Purification Technologies

Construction year

  • 2003

Plant performance

    • Population Equivalent: 1000
    • Daily Output: 200 M3/Dd
    • COD In: <700 Mg/L
    • COD Out: <40 Mg/L
    • Receiver: Surface Water Body

Need

The area where the new Alpe Adria Shopping Centre is located is not served by the public sewage and the wastewater is to discharge to the water course nearby.

Solution

In order the most efficient purifying treatment, with minimal environmental impact and use of the limited space available, we designed and realised a new MBR plant.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter