CasinĂ² Admiral

Design and construction of a wastewater treatment plant

360° Service

  • Design
  • Construction

Place

  • Kozina (SLO)

Purification Technologies

Construction year

  • 2009

Plant performance

    • Population Equivalent: 300
    • COD Out: 60 Mg/L
    • Receiver: Sewer System

Need

Since the space available was very limited the customer needed a compact solution to treat the wastewater of the Casino and the adjacent accommodation facilities.

Solution

Considering the limited space available we decided to realise a new plant to treat wastewater by the MBBR technology, which is compact and easy to manage.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter