
Area
Place
- San Giorgio della Richinvelda - Italy
Construction year
- 2023
Plant performance
-
- Abitanti Equivalenti: 30
- Portata giornaliera: 2 m3/gg
- COD in: 1.500 mg/l
- COD out: <100 mg/l
- Corpo ricettore: terreno
Need
The client required a new plant capable of removing physosanitary products that are washed off the spraying field vehicles during cleaning operations.
Solution
CID designed a compact and simple pre-built buried concrete plant containg a grease trap, an accumulation tank, a biological oxidation and MBR filtration tank and a purified water tank.
All of the machines and instruments are installed inside a concrete cabinet placed beside the buried plant, along an activated carbon filter designed specifically to removed phytosanitary products.