Area
Place
- Tricesimo (Ud) - Italy
Construction year
- 1993
Plant performance
-
- Population Equivalent: 200
- Daily Output: 8 M3/Dd
- COD Out: <500 Mg/L
- Receiver: Sewer System
Need
After the enlargement of the slaughterhouse and laboratory, the existing treatment plant was undersized with respect to actual needs.
Solution
We redesigned and updated the entire water flow line by replacing all electromechanical equipments.