Municipality of Postojna (SLO)

Design and construction of a wastewater treatment plant

360° Service

  • Design
  • Construction

Place

  • Grotte di Postumia (SLO)

Purification Technologies

Construction year

  • 2011

Plant performance

    • Population Equivalent: 50
    • Daily Output: 10 M3/Dd
    • Receiver: Land

Need

The tourist area within the caves of Postojna was not equipped with a wastewater treatment plant for the public toilets, therefore, the wastewater impacted on environment.

Solution

The plant should necessarily find place inside the caves, which extend in depth and can be reached by means of a special train only. We adopted the MBBR technology in combination with the MBR one in order to reduce the space required for the installation of the treatment plant.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter