ISEA S.p.A. (LO)

Design and construction of a containerised wastewater treatment plant for oil rigs

360° Service

  • Design
  • Construction

Place

  • British Petroleum (Algeria)

Purification Technologies

Construction Technologies

Construction year

  • 2007

Plant performance

    • Population Equivalent: 10 Plants X (Population equivalent: 100)
    • Daily Output: 20 M3/Dd
    • COD Out: <100 Mg/L
    • Receiver: Land

Need

An important Oil & Gas company needed 10 prefabricated plants to the benefit of some oil rigs (RIG) in the Algerian desert, which could fully comply to the compelling discharge limits.

Solution

Therefore, we opted for the MBR technology and we realised each plant within an adequately modified, standard ISO 20’ shipping container.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter