Marina Ibacom DOO

Design and construction of a wastewater treatment plant of a beach resort

360° Service

Place

  • Lisignano - Croatia

Purification Technologies

Construction year

  • 2023

Plant performance

    • Abitanti Equivalenti: 1000
    • Portata giornaliera: 180 m3/gg
    • COD in: 4.000 mg/l
    • COD out: <100 mg/l
    • Corpo ricettore: terreno

Need

The cliente required a brand new wastewater treatment plant for its newly buily beach resort.

Solution

Considering the very strict limits that must be respected to discharge the purified waters in the ground and the very high variabily of the wastewater exiting the resort, CID opted for a membrane bio reactor technology plant, built with totally buired and hidden concrete tanks.

The purification treatment process is integrated with a very strong automation to limit the need of human resources and can be completely remotely controlled via radio.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter