Agricola Pittaro Angelo

Design and construction of a wastewater treatment plant for the wine cellar

360° Service

  • Design
  • Construction

Place

  • San Martino al Tagliamento (Pn) - Italy

Purification Technologies

Construction year

  • 1999

Plant performance

    • Population Equivalent: 400
    • Daily Output: 5 M3/Dd
    • COD In: 5000 Mg/L
    • COD Out: <160 Mg/L
    • Receiver: Surface Water Body

Need

The co-operative wine cellar is not served by the public sewage, therefore wastewater is discharged to land.Hence, the need of a wastewater treatment plant.

Solution

We planned and realised a plant with concrete tanks and the SBR technology.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter