Area
360° Service
- Design
- Construction
Place
- San Martino al Tagliamento (Pn) - Italy
Construction year
- 1999
Plant performance
-
- Population Equivalent: 400
- Daily Output: 5 M3/Dd
- COD In: 5000 Mg/L
- COD Out: <160 Mg/L
- Receiver: Surface Water Body
Need
The co-operative wine cellar is not served by the public sewage, therefore wastewater is discharged to land.Hence, the need of a wastewater treatment plant.
Solution
We planned and realised a plant with concrete tanks and the SBR technology.