Slaughterhouse of Kreplje (SLO)

Progettazione e costruzione dell’impianto di depurazione acque reflue

360° Service

  • Design
  • Construction

Place

  • Kreplje (SLO)

Purification Technologies

Construction year

  • 2010

Plant performance

    • Population Equivalent: 600
    • Daily Output: 20 M3/Dd
    • Receiver: Sewer System

Need

Design and construction of the slaughterhouse’s treatment plant with limited space available.

Solution

Considering the limited space available we decided to realise a new plant to treat wastewater by the membrane technology (MBR).This technology allowed a reduction by 50% of the area occupied by tanks ensuring such a high quality in treated water to be used directly as technical water, without further treatments.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter