Friuli Shopping Centre

Design and construction of an alternate nitrification/denitrification plant at the wastewater treatment

360° Service

Place

  • Tavagnacco (Ud) - Italy

Purification Technologies

Construction year

  • 1998

Plant performance

    • POPULATION EQUIVALENT: 2200
    • DAILY OUTPUT: 440 M3/DD
    • COD IN: <700 MG/L
    • COD OUT: <40 MG/L
    • NTOT IN: >100 MG/L
    • NTOT OUT: <10 MG/L
    • RECEIVER: LAND

Need

The plant, designed in accordance with outdated regulations, did not include a line for phosphorus removal.

Solution

Since it was impossible to realise any new construction, we designed and created a system of nitrification/denitrification working on alternating cycles and controlled by special process sensors.

Similar plants
+39 0432 888070

    addplus-sign-to-addrefreshright-arrowlogout-2logout-1 arrows credit-card technologydownloadable-file-interface-symbol-of-strokedownload-from-cloudthumb-upcancelsearchlogout maleshoprating starCheck+EmailFacebookFaxMapsPhonePrintTwitter