Area
360° Service
- Design
- Construction
Place
- San Vito al Tagliamento - Italy
Construction year
- 2022
Need
LTA required dismantling of the old aeration system and the installation of a new one.
Solution
CID dismantled the existing system and installed a brand new one, built with membrane disk diffuser, PVC piping and stainless steel manifolds.