Area
Place
- Zuliano (Ud) - Italy
Construction year
- 1994
Plant performance
-
- Population Equivalent: 100
- Daily Output: 20 M3/Dd
- COD Out: <100 Mg/L
- Receiver: Land
Need
The motorway service station is not served by the public sewage, therefore wastewater is discharged to land. The existing biodisc treatment plant could not ensure the compliance with the requirements by law. Hence, the need of a new wastewater treatment plant and an underground irrigation system.
Solution
To meet the tight deadlines imposed by the Controlling Authority and minimize costs, we designed and realised a prefabricated plant consisting of glazed steel tanks, and an underground irrigation system.